Bakrol, Ahmedabad, India+91 97277 86892

Wastewater treatment

Tertiary Wastewater Treatment

Polishing of secondary-treated wastewater for a defined reuse or discharge objective.

Conceptual modular wastewater treatment equipment arrangement
Wastewater equipment family — conceptual 3D render

SYSTEM VIEW

See the equipment.
Understand the process.

The render illustrates the Effluent treatment equipment family. Your final arrangement follows the project duty, site layout and approved design.

View process flow Browse the visual gallery

Conceptual 3D visualization · equipment details are illustrative.

PROCESS FLOW DIAGRAM

Filtration & conditioning route

Download SVG
Incoming water → Feed conditioning → Selected filtration → Quality monitoring → Next treatment or reuse
Main process Utility / chemical Residual stream Recovery / recycle

Swipe the diagram to view every stage.

Design notes
  • Disinfection, media and conditioning are selected from the required water quality.

Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.

PROCESS & EQUIPMENT DETAILS

How tertiary wastewater treatment fits your process.

Operating principle

Polishing of secondary-treated wastewater for a defined reuse or discharge objective.

Tertiary treatment polishes upstream treated wastewater for a defined final use. Solids removal, membranes, adsorption or disinfection are selected from residual water quality and the reuse specification.

Engineering checks

  • Service flow and selected hydraulic loading
  • Bed depth, contact time and freeboard
  • Backwash expansion or regeneration demand
  • Design pressure, materials and corrosion compatibility

Configuration & equipment

  1. Upstream treated-water interface
  2. Selected solids-removal stage
  3. Adsorption / membrane stage where required
  4. Disinfection where required
  5. Reuse-water storage and transfer
  6. Water-quality monitoring

Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.

Process / operating itemEngineering requirement
Process review 1Disinfection, media and conditioning are selected from the required water quality.
Operating and maintenanceRecord inlet/outlet pressure and water quality. Inspect media loss and distribution. Carry out backwash or regeneration to approved procedures.
DocumentationProject-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed.

EQUIPMENT DRAWINGS

2D layout & exploded component views.

Tertiary Wastewater Treatment 2D functional arrangement
Tertiary Wastewater Treatment component decomposition reference
Tertiary Wastewater Treatment — component decomposition

EXPLODED VIEW

Understand the assembly.

  1. Upstream treated-water interface
  2. Selected solids-removal stage
  3. Adsorption / membrane stage where required
  4. Disinfection where required
  5. Reuse-water storage and transfer
  6. Water-quality monitoring

YOUR PROJECT, YOUR DESIGN BASIS

Configure your requirement.

Enter what you know. Leave unavailable values blank for engineering review.

Process inputs

Industry type, effluent flow and operating hours, pH, COD, BOD, TSS, TDS, oil & grease, colour/metals/specific contaminants, equalization pattern, reuse/discharge target and treatability data.

Technologies you would like to discuss

Select candidates for review. This does not establish a treatment sequence.

Equipment & execution preferences

Materials are reviewed separately for each component against the fluid chemistry, temperature and service conditions. Preferences are subject to technical suitability and the agreed proposal.

No details are sent until you choose a sending channel.

A solution shaped by your requirements.

Polishing of secondary-treated wastewater for a defined reuse or discharge objective. Treatment begins with understanding the effluent sources and their variability. Physical, chemical and biological stages are combined as appropriate, followed by polishing and sludge management.

What we review

  • Average daily flow and hourly inflow profile
  • Operating hours and peak-flow conditions
  • BOD, COD, TSS, pH, nutrients and relevant contaminants
  • Reuse or discharge objective
  • Available area, levels and site interfaces
  • Treatability, sludge handling and odour constraints

Capacity, materials, operating conditions and performance are specified after review of your project data. Product images are conceptual visualizations.

From design to operation

Our scope can cover process and mechanical engineering, manufacturing, supply, installation, commissioning and ongoing support. The final proposal clearly defines supplier scope, client interfaces, optional items and exclusions.

APPLICATIONS

Connect equipment to your industry.

Review the application, data requirements and candidate treatment options.