Bakrol, Ahmedabad, India+91 97277 86892

Industry solutions

Municipal / Infrastructure

Connect treatment selection with collection networks, site interfaces and end use.

APPLICATION PRIORITIES

Start with the water duties at your site.

01

Collection and hydraulic interfaces

02

Inflow variation and phased capacity

03

Treatment, sludge and reuse boundaries

Information that shapes the treatment route

Use measured flows, representative sampling and the final use of treated water to establish your design basis. Separate process and domestic streams where they have different treatment needs.

  • Catchment and measured flow profile
  • Collection-network levels and pumping data
  • Influent analysis and final-water objective
  • Phasing, land and sludge-management constraints

How the review progresses

  1. Map the incoming water, individual wastewater sources and operating schedule.
  2. Review representative analysis, existing equipment and site constraints.
  3. Identify candidate treatment blocks and any required laboratory, pilot or vendor studies.
  4. Agree the water balance, equipment duties, materials and supply interfaces in a technical proposal.

YOUR PROJECT, YOUR DESIGN BASIS

Build your application brief.

Enter what you know. Leave unavailable values blank for engineering review.

Process inputs

Technologies you would like to discuss

Select candidates for review. This does not establish a treatment sequence.

Equipment & execution preferences

Materials are reviewed separately for each component against the fluid chemistry, temperature and service conditions. Preferences are subject to technical suitability and the agreed proposal.

No details are sent until you choose a sending channel.

Browse all 25 industry applications