Bakrol, Ahmedabad, India+91 97277 86892

Industry solutions

Residential & Commercial Buildings

Plan sewage treatment and reuse around occupancy, water demand and available space.

APPLICATION PRIORITIES

Start with the water duties at your site.

01

Occupancy and peak sewage demand

02

Treatment within the available site footprint

03

Reuse storage and distribution

Information that shapes the treatment route

Use measured flows, representative sampling and the final use of treated water to establish your design basis. Separate process and domestic streams where they have different treatment needs.

  • Residential and commercial occupancy
  • Inflow profile and peak-hour basis
  • Basement access, headroom and ventilation
  • Flushing and gardening demand

How the review progresses

  1. Map the incoming water, individual wastewater sources and operating schedule.
  2. Review representative analysis, existing equipment and site constraints.
  3. Identify candidate treatment blocks and any required laboratory, pilot or vendor studies.
  4. Agree the water balance, equipment duties, materials and supply interfaces in a technical proposal.

YOUR PROJECT, YOUR DESIGN BASIS

Build your application brief.

Enter what you know. Leave unavailable values blank for engineering review.

Process inputs

Technologies you would like to discuss

Select candidates for review. This does not establish a treatment sequence.

Equipment & execution preferences

Materials are reviewed separately for each component against the fluid chemistry, temperature and service conditions. Preferences are subject to technical suitability and the agreed proposal.

No details are sent until you choose a sending channel.

Browse all 25 industry applications