Operating principle
Site-built treatment basins integrated with mechanical, electrical and instrumentation packages for the selected treatment route.
The selected treatment process is installed in site-built basins. Hydraulic levels, access, structural loads and equipment interfaces are coordinated before civil construction.
Engineering checks
- Review geotechnical data, groundwater and structural design
- Coordinate hydraulic profile, embedded items and access
- Confirm design flow, operating profile and feed properties
- Agree materials, site interfaces, utilities and maintenance access
Configuration & equipment
- Site-built process basins
- Pumps and pipework
- Aeration or mixing as required
- Process-specific solids separation
- Sludge handling
- Electrical and controls
Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.
| Process / operating item | Engineering requirement |
|---|---|
| Process review 1 | Construction method does not determine the treatment technology. Choose the process using feed analysis and the final objective. |
| Process review 2 | RCC basins or fabricated modules need coordinated hydraulic, structural and maintenance interfaces. |
| Operating and maintenance | Inspect concrete, lining and joints. Maintain mechanical equipment and process monitoring. |
| Documentation | Project-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed. |
PDF & DRAWING DOWNLOADS
Keep the technical references.
Read the wastewater treatment brochure, or download the process and arrangement drawings below.
PROCESS FLOW DIAGRAM
Treatment route & construction interfaces
Swipe the diagram to view every stage.
- Construction method does not determine the treatment technology. Choose the process using feed analysis and the final objective.
- RCC basins or fabricated modules need coordinated hydraulic, structural and maintenance interfaces.
Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.
EQUIPMENT DRAWINGS
2D layout & exploded component views.
Review the functional arrangement and the components that make up the equipment.
EXPLODED VIEW
Understand the assembly.
The separated component schematic identifies the main equipment groups. Vendor-specific internal geometry is established during detailed engineering.
- Site-built process basins
- Pumps and pipework
- Aeration or mixing as required
- Process-specific solids separation
- Sludge handling
- Electrical and controls