PRODUCT DESCRIPTION & TECHNICAL DOCUMENTS
How tertiary wastewater treatment fits your process.
Operating principle
Polishing of secondary-treated wastewater for a defined reuse or discharge objective.
Tertiary treatment polishes upstream treated wastewater for a defined final use. Solids removal, membranes, adsorption or disinfection are selected from residual water quality and the reuse specification.
Engineering checks
- Service flow and selected hydraulic loading
- Bed depth, contact time and freeboard
- Backwash expansion or regeneration demand
- Design pressure, materials and corrosion compatibility
Configuration & equipment
- Upstream treated-water interface
- Selected solids-removal stage
- Adsorption / membrane stage where required
- Disinfection where required
- Reuse-water storage and transfer
- Water-quality monitoring
Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.
| Process / operating item | Engineering requirement |
|---|---|
| Process review 1 | Disinfection, media and conditioning are selected from the required water quality. |
| Operating and maintenance | Record inlet/outlet pressure and water quality. Inspect media loss and distribution. Carry out backwash or regeneration to approved procedures. |
| Documentation | Project-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed. |
PDF & DRAWING DOWNLOADS
Keep the technical references.
Read the wastewater treatment brochure, or download the process and arrangement drawings below.
PROCESS FLOW DIAGRAM
Filtration & conditioning route
Swipe the diagram to view every stage.
- Disinfection, media and conditioning are selected from the required water quality.
Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.
EQUIPMENT DRAWINGS
2D layout & exploded component views.
Review the functional arrangement and the components that make up the equipment.
EXPLODED VIEW
Understand the assembly.
The separated component schematic identifies the main equipment groups. Vendor-specific internal geometry is established during detailed engineering.
- Upstream treated-water interface
- Selected solids-removal stage
- Adsorption / membrane stage where required
- Disinfection where required
- Reuse-water storage and transfer
- Water-quality monitoring