Wastewater treatment
Biological ETP
Biological treatment for biodegradable effluent under suitable and verified operating conditions.

SYSTEM VIEW
See the equipment.
Understand the process.
The render illustrates the Effluent treatment equipment family. Your final arrangement follows the project duty, site layout and approved design.
View process flow Browse the visual galleryConceptual 3D visualization · equipment details are illustrative.
PROCESS FLOW DIAGRAM
Biological effluent treatment
Swipe the diagram to view every stage.
- Biodegradability, toxicity, loading and nutrients determine biological suitability.
- Biomass retention and recycle depend on the selected technology.
Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.
PROCESS & EQUIPMENT DETAILS
How biological etp fits your process.
Operating principle
Biological treatment for biodegradable effluent under suitable and verified operating conditions.
Biological treatment uses a controlled microbial process to reduce biodegradable pollution. MBBR, MBR, SBR and ASP use different biomass-retention and solids-separation arrangements.
Engineering checks
- Inflow profile, BOD, COD, TSS and nutrients
- Biodegradability and inhibition risks
- Hydraulic and organic loading
- Oxygen transfer, solids handling and reuse objective
Configuration & equipment
- Inlet screening and equalization interface
- Selected biological reactor
- Aeration and mixing equipment
- Biomass retention / separation stage
- Sludge withdrawal and handling
- Treated-water polishing as required
- Monitoring, controls and sampling
Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.
| Process / operating item | Engineering requirement |
|---|---|
| Process review 1 | Biodegradability, toxicity, loading and nutrients determine biological suitability. |
| Process review 2 | Biomass retention and recycle depend on the selected technology. |
| Operating and maintenance | Trend process water quality and biomass condition. Inspect aeration distribution and mechanical equipment. Maintain a defined sludge-wasting and sampling routine. |
| Documentation | Project-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed. |
EQUIPMENT DRAWINGS
2D layout & exploded component views.
Review the functional arrangement and the components that make up the equipment.
EXPLODED VIEW
Understand the assembly.
The separated component schematic identifies the main equipment groups. Vendor-specific internal geometry is established during detailed engineering.
- Inlet screening and equalization interface
- Selected biological reactor
- Aeration and mixing equipment
- Biomass retention / separation stage
- Sludge withdrawal and handling
- Treated-water polishing as required
- Monitoring, controls and sampling
YOUR PROJECT, YOUR DESIGN BASIS
Configure your requirement.
Enter what you know. Leave unavailable values blank for engineering review.
A solution shaped by your requirements.
Biological treatment for biodegradable effluent under suitable and verified operating conditions. Treatment begins with understanding the effluent sources and their variability. Physical, chemical and biological stages are combined as appropriate, followed by polishing and sludge management.
What we review
- Average daily flow and hourly inflow profile
- Operating hours and peak-flow conditions
- BOD, COD, TSS, pH, nutrients and relevant contaminants
- Reuse or discharge objective
- Available area, levels and site interfaces
- Treatability, sludge handling and odour constraints
Capacity, materials, operating conditions and performance are specified after review of your project data. Product images are conceptual visualizations.
From design to operation
Our scope can cover process and mechanical engineering, manufacturing, supply, installation, commissioning and ongoing support. The final proposal clearly defines supplier scope, client interfaces, optional items and exclusions.
APPLICATIONS
Connect equipment to your industry.
Review the application, data requirements and candidate treatment options.