Industry solutions
Dairy
Bring milk losses, fats, cleaning cycles and peak flows into the design basis.
APPLICATION PRIORITIES
Start with the water duties at your site.
Cleaning-cycle peaks and segregation
Fat separation and biological treatability
Information that shapes the treatment route
Use measured flows, representative sampling and the final use of treated water to establish your design basis. Separate process and domestic streams where they have different treatment needs.
- Milk-processing operations and cleaning schedule
- Flow during production and cleaning
- Fat, organic load, pH and temperature analysis
- Available equalization and sludge-handling area
How the review progresses
- Map the incoming water, individual wastewater sources and operating schedule.
- Review representative analysis, existing equipment and site constraints.
- Identify candidate treatment blocks and any required laboratory, pilot or vendor studies.
- Agree the water balance, equipment duties, materials and supply interfaces in a technical proposal.
YOUR PROJECT, YOUR DESIGN BASIS
Build your application brief.
Enter what you know. Leave unavailable values blank for engineering review.


