PRODUCT DESCRIPTION & TECHNICAL DOCUMENTS
How uasb reactor for etp fits your process.
Operating principle
Upflow anaerobic sludge blanket treatment for suitable biodegradable industrial effluent, with biogas collection and downstream polishing.
Wastewater rises through an anaerobic sludge blanket. Microorganisms convert suitable biodegradable matter to biogas; a gas-liquid-solids separator retains biomass and separates the gas. Effluent generally requires downstream polishing.
Engineering checks
- Confirm treatability, organic loading, temperature and inhibitory compounds
- Assess startup biomass, gas treatment, ventilation and downstream polishing
- Confirm design flow, operating profile and feed properties
- Agree materials, site interfaces, utilities and maintenance access
Configuration & equipment
- Inlet distribution at reactor base
- Anaerobic sludge blanket
- Three-phase separator
- Effluent collection launder
- Biogas collection and safety train
- Sludge withdrawal and sampling
Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.
| Process / operating item | Engineering requirement |
|---|---|
| Process review 1 | No aeration is supplied to the anaerobic reactor. Feed biodegradability, toxicity, temperature and loading govern selection. |
| Process review 2 | Biogas requires designed collection, treatment and safety provisions. |
| Operating and maintenance | Trend pH, alkalinity, volatile fatty acids and loading. Inspect gas collection and sludge distribution. |
| Documentation | Project-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed. |
PDF & DRAWING DOWNLOADS
Keep the technical references.
Read the wastewater treatment brochure, or download the process and arrangement drawings below.
PROCESS FLOW DIAGRAM
UASB anaerobic treatment
Swipe the diagram to view every stage.
- No aeration is supplied to the anaerobic reactor. Feed biodegradability, toxicity, temperature and loading govern selection.
- Biogas requires designed collection, treatment and safety provisions.
Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.
EQUIPMENT DRAWINGS
2D layout & exploded component views.
Review the functional arrangement and the components that make up the equipment.
EXPLODED VIEW
Understand the assembly.
The separated component schematic identifies the main equipment groups. Vendor-specific internal geometry is established during detailed engineering.
- Inlet distribution at reactor base
- Anaerobic sludge blanket
- Three-phase separator
- Effluent collection launder
- Biogas collection and safety train
- Sludge withdrawal and sampling




