PRODUCT DESCRIPTION & TECHNICAL DOCUMENTS
How screw press fits your process.
Operating principle
Mechanical sludge dewatering selected around solids characteristics and conditioning trials.
Sludge handling reduces volume by settling, drainage or mechanical dewatering. Actual solids capture and cake properties require tests with the selected equipment.
Engineering checks
- Sludge volume and dry-solids load
- Dewaterability and polymer trials
- Required cake handling route
- Wash-water and filtrate-return interfaces
Configuration & equipment
- Sludge feed interface
- Conditioning system as required
- Selected thickening / dewatering unit
- Filtrate / centrate collection
- Cake or concentrated-sludge discharge
- Cleaning and control provisions
Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.
| Process / operating item | Engineering requirement |
|---|---|
| Process review 1 | Equipment selection depends on sludge characteristics and the required solids duty. |
| Process review 2 | Filtrate and drainage return only to a reviewed collection or treatment point. |
| Operating and maintenance | Inspect wear and filtration surfaces. Follow wash and shutdown procedures. Record feed solids, capture and cake condition. |
| Documentation | Project-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed. |
PDF & DRAWING DOWNLOADS
Keep the technical references.
Read the wastewater treatment brochure, or download the process and arrangement drawings below.
PROCESS FLOW DIAGRAM
Sludge handling & dewatering
Swipe the diagram to view every stage.
- Equipment selection depends on sludge characteristics and the required solids duty.
- Filtrate and drainage return only to a reviewed collection or treatment point.
Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.
EQUIPMENT DRAWINGS
2D layout & exploded component views.
Review the functional arrangement and the components that make up the equipment.
EXPLODED VIEW
Understand the assembly.
The separated component schematic identifies the main equipment groups. Vendor-specific internal geometry is established during detailed engineering.
- Sludge feed interface
- Conditioning system as required
- Selected thickening / dewatering unit
- Filtrate / centrate collection
- Cake or concentrated-sludge discharge
- Cleaning and control provisions