Bakrol, Ahmedabad, India+91 97277 86892

Wastewater treatment

Oily Wastewater Treatment

Separation and treatment selected around free, dispersed and emulsified oil characteristics.

Conceptual 3D equipment render of Oily Wastewater Treatment
Oily Wastewater Treatment — conceptual 3D equipment render. Final configuration follows the approved project design.

3D EQUIPMENT VIEW

Oily Wastewater Treatment

Explore the equipment arrangement, then read how the system works and review its technical drawings.

Description & drawings Browse equipment renders

Conceptual equipment render. Final dimensions and configuration follow the approved project design.

PRODUCT DESCRIPTION & TECHNICAL DOCUMENTS

How oily wastewater treatment fits your process.

Operating principle

Separation and treatment selected around free, dispersed and emulsified oil characteristics.

Fine air bubbles attach to suitable suspended material and float it to the surface. Coagulation and flocculation may be required based on treatability tests.

Engineering checks

  • Jar / flotation test results
  • Solids load and required separation area
  • Recycle flow and air-release conditions
  • Float-handling and chemical requirements

Configuration & equipment

  1. Conditioned feed inlet
  2. Recycle pressurization pump
  3. Air-dissolution / saturation system
  4. Flotation separation tank
  5. Float collection mechanism
  6. Clarified outlet and sludge discharge

Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.

Process / operating itemEngineering requirement
Process review 1Removal efficiency and residual handling depend on the contaminant form and the selected separation process.
Operating and maintenanceInspect air release and recycle pressure. Clean float collection equipment. Trend treated-water quality and float consistency.
DocumentationProject-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed.

PDF & DRAWING DOWNLOADS

Keep the technical references.

Read the wastewater treatment brochure, or download the process and arrangement drawings below.

PROCESS FLOW DIAGRAM

Preliminary separation

Download drawing (SVG)
Incoming wastewater → Flow distribution → Oil / grease separation → Effluent collection → Further treatment
Main process Utility / chemical Residual stream Recovery / recycle

Swipe the diagram to view every stage.

Design notes
  • Removal efficiency and residual handling depend on the contaminant form and the selected separation process.

Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.

EQUIPMENT DRAWINGS

2D layout & exploded component views.

Oily Wastewater Treatment 2D functional arrangement
Oily Wastewater Treatment component decomposition reference
Oily Wastewater Treatment — component decomposition

EXPLODED VIEW

Understand the assembly.

  1. Conditioned feed inlet
  2. Recycle pressurization pump
  3. Air-dissolution / saturation system
  4. Flotation separation tank
  5. Float collection mechanism
  6. Clarified outlet and sludge discharge

EXPLORE YOUR DESIGN BASIS

See how operating hours change energy use.

Enter the total running electrical load for this equipment or plant, then adjust its daily running hours.

Illustrative arithmetic using your inputs. These values are not measured plant results or a performance promise.

Daily electricity
80.00 kWh/day
30-day electricity
2400.00 kWh

Energy = electrical kW × running hours. Constant running load; standby load, starting transients and tariff charges are excluded.

Open detailed calculator →

CONSTRUCTION OPTIONS

Modular fabrication or civil construction?

Prefabricated modular plant

Factory-fabricated process modules connect to agreed site tanks and utilities. Review transport dimensions, lifting access, corrosion protection and maintenance clearances.

For a packaged MBBR example, the anoxic and aerobic compartments have flat floors; a downstream tube-settler compartment can use a sludge hopper. Equalization and treated-water storage may be separate civil tanks.

Explore modular STP / ETP →

Civil construction plant

Site-built basins provide a project-specific layout. Process design must coordinate with soil conditions, groundwater, structural design, hydraulic levels and access for operation.

RCC construction can support several treatment technologies. Civil scope, embedded items, tank lining and mechanical interfaces are defined before execution.

Explore civil STP / ETP →

YOUR PROJECT, YOUR DESIGN BASIS

Configure your requirement.

Enter what you know. Leave unavailable values blank for engineering review.

Process inputs

Industry type, effluent flow and operating hours, pH, COD, BOD, TSS, TDS, oil & grease, colour/metals/specific contaminants, equalization pattern, reuse/discharge target and treatability data.

Technologies you would like to discuss

Select candidates for review. This does not establish a treatment sequence.

Equipment & execution preferences

Materials are reviewed separately for each component against the fluid chemistry, temperature and service conditions. Preferences are subject to technical suitability and the agreed proposal.

No details are sent until you choose a sending channel.

A solution shaped by your requirements.

Separation and treatment selected around free, dispersed and emulsified oil characteristics. Treatment begins with understanding the effluent sources and their variability. Physical, chemical and biological stages are combined as appropriate, followed by polishing and sludge management.

What we review

  • Average daily flow and hourly inflow profile
  • Operating hours and peak-flow conditions
  • BOD, COD, TSS, pH, nutrients and relevant contaminants
  • Reuse or discharge objective
  • Available area, levels and site interfaces
  • Treatability, sludge handling and odour constraints

Capacity, materials, operating conditions and performance are specified after review of your project data. Product images are conceptual visualizations.

From design to operation

Our scope can cover process and mechanical engineering, manufacturing, supply, installation, commissioning and ongoing support. The final proposal clearly defines supplier scope, client interfaces, optional items and exclusions.

APPLICATIONS

Connect equipment to your industry.

Review the application, data requirements and candidate treatment options.