Bakrol, Ahmedabad, India+91 97277 86892

Wastewater treatment

MBR Membrane System

Membrane separation packages integrated with an engineered biological treatment system.

Conceptual modular wastewater treatment installation with treatment tanks and service access
Modular wastewater plant — conceptual 3D render

SYSTEM VIEW

See the equipment.
Understand the process.

The render illustrates the Sewage treatment equipment family. Your final arrangement follows the project duty, site layout and approved design.

View process flow Browse the visual gallery

Conceptual 3D visualization · equipment details are illustrative.

PROCESS FLOW DIAGRAM

Membrane bioreactor treatment

Download SVG
Fine screening & equalization → Biological treatment → MBR membrane separation → Disinfection as required → Treated-water storage
Main process Utility / chemical Residual stream Recovery / recycle

Swipe the diagram to view every stage.

Design notes
  • Membranes retain biomass; a secondary settling tank is not part of this indicative route.
  • Aeration, membrane cleaning and sludge wasting are part of detailed system design.

Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.

PROCESS & EQUIPMENT DETAILS

How mbr membrane system fits your process.

Operating principle

Membrane separation packages integrated with an engineered biological treatment system.

An MBR membrane separates treated water from biological mixed liquor. Submerged or external configurations require the selected membrane manufacturer’s filtration, cleaning and air-scour basis.

Engineering checks

  • Membrane configuration and mixed-liquor properties
  • Net flux, peak duty and train availability
  • Air scour, cleaning and membrane integrity
  • Vendor-approved operating and chemical limits

Configuration & equipment

  1. Selected membrane modules / cassettes
  2. Mixed-liquor feed or immersion zone
  3. Permeate collection manifold
  4. Air-scour system where required
  5. Cleaning and backwash connections
  6. Transmembrane-pressure monitoring

Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.

Process / operating itemEngineering requirement
Process review 1Membranes retain biomass; a secondary settling tank is not part of this indicative route.
Process review 2Aeration, membrane cleaning and sludge wasting are part of detailed system design.
Operating and maintenanceTrend transmembrane pressure. Follow approved backwash and cleaning cycles. Perform membrane integrity checks.
DocumentationProject-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed.

EQUIPMENT DRAWINGS

2D layout & exploded component views.

MBR Membrane System 2D functional arrangement
MBR Membrane System component decomposition reference
MBR Membrane System — component decomposition

EXPLODED VIEW

Understand the assembly.

  1. Selected membrane modules / cassettes
  2. Mixed-liquor feed or immersion zone
  3. Permeate collection manifold
  4. Air-scour system where required
  5. Cleaning and backwash connections
  6. Transmembrane-pressure monitoring

YOUR PROJECT, YOUR DESIGN BASIS

Configure your requirement.

Enter what you know. Leave unavailable values blank for engineering review.

Process inputs

Daily sewage flow, operating pattern, population/source, BOD/COD/TSS, oil & grease if relevant, nitrogen targets, reuse/discharge objective, footprint, odour/noise and automation constraints.

Equipment & execution preferences

Materials are reviewed separately for each component against the fluid chemistry, temperature and service conditions. Preferences are subject to technical suitability and the agreed proposal.

No details are sent until you choose a sending channel.

A solution shaped by your requirements.

Membrane separation packages integrated with an engineered biological treatment system. Treatment begins with understanding the effluent sources and their variability. Physical, chemical and biological stages are combined as appropriate, followed by polishing and sludge management.

What we review

  • Average daily flow and hourly inflow profile
  • Operating hours and peak-flow conditions
  • BOD, COD, TSS, pH, nutrients and relevant contaminants
  • Reuse or discharge objective
  • Available area, levels and site interfaces
  • Treatability, sludge handling and odour constraints

Capacity, materials, operating conditions and performance are specified after review of your project data. Product images are conceptual visualizations.

From design to operation

Our scope can cover process and mechanical engineering, manufacturing, supply, installation, commissioning and ongoing support. The final proposal clearly defines supplier scope, client interfaces, optional items and exclusions.

APPLICATIONS

Connect equipment to your industry.

Review the application, data requirements and candidate treatment options.