PRODUCT DESCRIPTION & TECHNICAL DOCUMENTS
How filter press fits your process.
Operating principle
Pressure filtration for sludge dewatering with feed-specific conditioning and cycle selection.
Sludge handling reduces volume by settling, drainage or mechanical dewatering. Actual solids capture and cake properties require tests with the selected equipment.
Engineering checks
- Sludge volume and dry-solids load
- Dewaterability and polymer trials
- Required cake handling route
- Wash-water and filtrate-return interfaces
Configuration & equipment
- Sludge feed interface
- Conditioning system as required
- Selected thickening / dewatering unit
- Filtrate / centrate collection
- Cake or concentrated-sludge discharge
- Cleaning and control provisions
Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.
| Process / operating item | Engineering requirement |
|---|---|
| Process review 1 | Equipment selection depends on sludge characteristics and the required solids duty. |
| Process review 2 | Filtrate and drainage return only to a reviewed collection or treatment point. |
| Operating and maintenance | Inspect wear and filtration surfaces. Follow wash and shutdown procedures. Record feed solids, capture and cake condition. |
| Documentation | Project-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed. |
PDF & DRAWING DOWNLOADS
Keep the technical references.
Read the wastewater treatment brochure, or download the process and arrangement drawings below.
PROCESS FLOW DIAGRAM
Sludge handling & dewatering
Swipe the diagram to view every stage.
- Equipment selection depends on sludge characteristics and the required solids duty.
- Filtrate and drainage return only to a reviewed collection or treatment point.
Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.
EQUIPMENT DRAWINGS
2D layout & exploded component views.
Review the functional arrangement and the components that make up the equipment.
EXPLODED VIEW
Understand the assembly.
The separated component schematic identifies the main equipment groups. Vendor-specific internal geometry is established during detailed engineering.
- Sludge feed interface
- Conditioning system as required
- Selected thickening / dewatering unit
- Filtrate / centrate collection
- Cake or concentrated-sludge discharge
- Cleaning and control provisions