PRODUCT DESCRIPTION & TECHNICAL DOCUMENTS
How aeration system fits your process.
Operating principle
Air distribution and aeration equipment selected from oxygen demand and mixing requirements.
An air supply and distribution system transfers oxygen or provides mixing. Actual oxygen demand, field transfer efficiency, submergence and system losses establish blower duty.
Engineering checks
- Actual oxygen demand and field transfer corrections
- Submergence and total pressure losses
- Minimum mixing and turndown requirements
- Duty/standby and acoustic requirements
Configuration & equipment
- Air inlet filter and silencer
- Blower / air supply package
- Isolation and non-return provisions
- Air distribution header
- Diffuser laterals and diffusers
- Pressure and airflow monitoring
Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.
| Process / operating item | Engineering requirement |
|---|---|
| Process review 1 | Air demand and pressure are based on oxygen transfer, submergence and distribution losses. |
| Process review 2 | Relief, isolation, non-return protection and controls require detailed equipment selection. |
| Operating and maintenance | Inspect filters and air distribution. Trend pressure and motor load. Clean diffusers according to the selected material. |
| Documentation | Project-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed. |
PDF & DRAWING DOWNLOADS
Keep the technical references.
Read the wastewater treatment brochure, or download the process and arrangement drawings below.
PROCESS FLOW DIAGRAM
Aeration air supply
Swipe the diagram to view every stage.
- Air demand and pressure are based on oxygen transfer, submergence and distribution losses.
- Relief, isolation, non-return protection and controls require detailed equipment selection.
Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.
EQUIPMENT DRAWINGS
2D layout & exploded component views.
Review the functional arrangement and the components that make up the equipment.
EXPLODED VIEW
Understand the assembly.
The separated component schematic identifies the main equipment groups. Vendor-specific internal geometry is established during detailed engineering.
- Air inlet filter and silencer
- Blower / air supply package
- Isolation and non-return provisions
- Air distribution header
- Diffuser laterals and diffusers
- Pressure and airflow monitoring




