Filtration & dosing
UV Disinfection System
UV treatment selected around water UV transmittance, target organisms and validated equipment.

SYSTEM VIEW
See the equipment.
Understand the process.
The render illustrates the Softening & media filtration equipment family. Your final arrangement follows the project duty, site layout and approved design.
View process flow Browse the visual galleryConceptual 3D visualization · equipment details are illustrative.
PROCESS FLOW DIAGRAM
UV disinfection route
Swipe the diagram to view every stage.
- UV transmittance, flow, fouling and dose validation determine reactor selection.
- The diagram does not specify a disinfection performance guarantee.
Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.
PROCESS & EQUIPMENT DETAILS
How uv disinfection system fits your process.
Operating principle
UV treatment selected around water UV transmittance, target organisms and validated equipment.
Disinfection or oxidation performance depends on contact conditions and water quality. UV uses a validated reactor and exposure dose; ozone or advanced oxidation requires an approved chemical and safety design.
Engineering checks
- Water quality and treatment objective
- Validated dose or treatability test basis
- Required contact and reaction conditions
- Interlocks, residual control and operator protection
Configuration & equipment
- Feed-quality and flow interface
- Reactor / contact assembly
- Selected energy or oxidant source
- Monitoring and control system
- Residual / off-gas handling where applicable
- Outlet sampling point
Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.
| Process / operating item | Engineering requirement |
|---|---|
| Process review 1 | UV transmittance, flow, fouling and dose validation determine reactor selection. |
| Process review 2 | The diagram does not specify a disinfection performance guarantee. |
| Operating and maintenance | Inspect the reactor and clean fouled surfaces. Verify sensors and safety interlocks. Replace consumables according to selected equipment instructions. |
| Documentation | Project-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed. |
EQUIPMENT DRAWINGS
2D layout & exploded component views.
Review the functional arrangement and the components that make up the equipment.
EXPLODED VIEW
Understand the assembly.
The separated component schematic identifies the main equipment groups. Vendor-specific internal geometry is established during detailed engineering.
- Feed-quality and flow interface
- Reactor / contact assembly
- Selected energy or oxidant source
- Monitoring and control system
- Residual / off-gas handling where applicable
- Outlet sampling point
YOUR PROJECT, YOUR DESIGN BASIS
Configure your requirement.
Enter what you know. Leave unavailable values blank for engineering review.
A solution shaped by your requirements.
UV treatment selected around water UV transmittance, target organisms and validated equipment. Equipment is selected from the treatment objective, flow profile and fluid characteristics. Media, contact conditions and maintenance provisions are reviewed for the actual duty.
What we review
- Design flow and operating hours
- Feed solids, particle characteristics and water analysis
- Required separation or conditioning duty
- Operating pressure and temperature
- Cleaning, backwash or replacement requirements
- Chemical compatibility and utility constraints
Capacity, materials, operating conditions and performance are specified after review of your project data. Product images are conceptual visualizations.
From design to operation
Our scope can cover process and mechanical engineering, manufacturing, supply, installation, commissioning and ongoing support. The final proposal clearly defines supplier scope, client interfaces, optional items and exclusions.
APPLICATIONS
Connect equipment to your industry.
Review the application, data requirements and candidate treatment options.
