Bakrol, Ahmedabad, India+91 97277 86892

Filtration & dosing

Chlorination System

Controlled chlorine dosing with contact time, demand and residual monitoring.

Conceptual 3D equipment render of Chlorination System
Chlorination System — conceptual 3D equipment render. Example liquid-hypochlorite dosing package. Chemical strength and dosing duty are project-specific.

3D EQUIPMENT VIEW

Chlorination System

Explore the equipment arrangement, then read how the system works and review its technical drawings.

Description & drawings Browse equipment renders

Conceptual equipment render. Final dimensions and configuration follow the approved project design.

PRODUCT DESCRIPTION & TECHNICAL DOCUMENTS

How chlorination system fits your process.

Operating principle

Controlled chlorine dosing with contact time, demand and residual monitoring.

A metering system introduces an approved chemical dose into the process. Solution strength, required dose and operating flow determine the dosing-pump duty.

Engineering checks

  • Approved chemical dose and concentration
  • Chemical compatibility and bund containment
  • Pump turndown and injection pressure
  • Flow-paced or feedback control philosophy

Configuration & equipment

  1. Chemical storage / day tank
  2. Suction line and isolation
  3. Metering pump
  4. Relief and back-pressure provisions
  5. Injection quill and non-return valve
  6. Calibration and control interface

Configuration options are reviewed against the project duty. Supply quantities and final scope are defined in the approved proposal.

Process / operating itemEngineering requirement
Process review 1Chemical compatibility, calibration, containment and safety accessories require detailed design.
Process review 2Dosing control follows the process requirement and verified chemical strength.
Operating and maintenanceCalibrate delivered dosing volume. Inspect tubing, valves and injection points. Follow chemical handling and flushing procedures.
DocumentationProject-specific datasheet, PFD, P&ID, equipment GA, electrical load list and O&M documentation as agreed.

PDF & DRAWING DOWNLOADS

Keep the technical references.

Read the water treatment & ro brochure, or download the process and arrangement drawings below.

PROCESS FLOW DIAGRAM

Chemical dosing arrangement

Download drawing (SVG)
Chemical storage → Preparation / dilution → Dosing pump → Injection point → Process mixing or contact
Main process Utility / chemical Residual stream Recovery / recycle

Swipe the diagram to view every stage.

Design notes
  • Chemical compatibility, calibration, containment and safety accessories require detailed design.
  • Dosing control follows the process requirement and verified chemical strength.

Indicative process overview. Equipment tags identify functional blocks only. Final PFDs, P&IDs, duties, sizes, valves and instruments are developed from the approved project design basis.

EQUIPMENT DRAWINGS

2D layout & exploded component views.

Chlorination System 2D functional arrangement
Chlorination System component decomposition reference
Chlorination System — component decomposition

EXPLODED VIEW

Understand the assembly.

  1. Chemical storage / day tank
  2. Suction line and isolation
  3. Metering pump
  4. Relief and back-pressure provisions
  5. Injection quill and non-return valve
  6. Calibration and control interface

EXPLORE YOUR DESIGN BASIS

See how operating hours change energy use.

Enter the total running electrical load for this equipment or plant, then adjust its daily running hours.

Illustrative arithmetic using your inputs. These values are not measured plant results or a performance promise.

Daily electricity
80.00 kWh/day
30-day electricity
2400.00 kWh

Energy = electrical kW × running hours. Constant running load; standby load, starting transients and tariff charges are excluded.

Open detailed calculator →

YOUR PROJECT, YOUR DESIGN BASIS

Configure your requirement.

Enter what you know. Leave unavailable values blank for engineering review.

Process inputs

Flow, water quality, target microorganism/oxidation duty, UV transmittance or oxidant demand where applicable, contact time, residual target, safety and automation.

Equipment & execution preferences

Materials are reviewed separately for each component against the fluid chemistry, temperature and service conditions. Preferences are subject to technical suitability and the agreed proposal.

No details are sent until you choose a sending channel.

A solution shaped by your requirements.

Controlled chlorine dosing with contact time, demand and residual monitoring. Equipment is selected from the treatment objective, flow profile and fluid characteristics. Media, contact conditions and maintenance provisions are reviewed for the actual duty.

What we review

  • Design flow and operating hours
  • Feed solids, particle characteristics and water analysis
  • Required separation or conditioning duty
  • Operating pressure and temperature
  • Cleaning, backwash or replacement requirements
  • Chemical compatibility and utility constraints

Capacity, materials, operating conditions and performance are specified after review of your project data. Product images are conceptual visualizations.

From design to operation

Our scope can cover process and mechanical engineering, manufacturing, supply, installation, commissioning and ongoing support. The final proposal clearly defines supplier scope, client interfaces, optional items and exclusions.

APPLICATIONS

Connect equipment to your industry.

Review the application, data requirements and candidate treatment options.