Industry solutions
Steel & Foundry
Plan for cooling, utilities, suspended solids and process-specific wastewater.
APPLICATION PRIORITIES
Start with the water duties at your site.
Scale and suspended-solids separation
Process-specific wastewater characterization
Information that shapes the treatment route
Use measured flows, representative sampling and the final use of treated water to establish your design basis. Separate process and domestic streams where they have different treatment needs.
- Cooling circuits and utility duties
- Solids loading and particle characteristics
- Oil and dissolved-constituent analysis
- Available settling, filtration and sludge interfaces
How the review progresses
- Map the incoming water, individual wastewater sources and operating schedule.
- Review representative analysis, existing equipment and site constraints.
- Identify candidate treatment blocks and any required laboratory, pilot or vendor studies.
- Agree the water balance, equipment duties, materials and supply interfaces in a technical proposal.
YOUR PROJECT, YOUR DESIGN BASIS
Build your application brief.
Enter what you know. Leave unavailable values blank for engineering review.




