Bakrol, Ahmedabad, India+91 97277 86892

Industry solutions

Steel & Foundry

Plan for cooling, utilities, suspended solids and process-specific wastewater.

APPLICATION PRIORITIES

Start with the water duties at your site.

01

Cooling and utility-water preparation

02

Scale and suspended-solids separation

03

Process-specific wastewater characterization

Information that shapes the treatment route

Use measured flows, representative sampling and the final use of treated water to establish your design basis. Separate process and domestic streams where they have different treatment needs.

  • Cooling circuits and utility duties
  • Solids loading and particle characteristics
  • Oil and dissolved-constituent analysis
  • Available settling, filtration and sludge interfaces

How the review progresses

  1. Map the incoming water, individual wastewater sources and operating schedule.
  2. Review representative analysis, existing equipment and site constraints.
  3. Identify candidate treatment blocks and any required laboratory, pilot or vendor studies.
  4. Agree the water balance, equipment duties, materials and supply interfaces in a technical proposal.

YOUR PROJECT, YOUR DESIGN BASIS

Build your application brief.

Enter what you know. Leave unavailable values blank for engineering review.

Process inputs

Technologies you would like to discuss

Select candidates for review. This does not establish a treatment sequence.

Equipment & execution preferences

Materials are reviewed separately for each component against the fluid chemistry, temperature and service conditions. Preferences are subject to technical suitability and the agreed proposal.

No details are sent until you choose a sending channel.

Browse all 25 industry applications